Apply Online For IESCO New Connection
Whether you own a new shop or property or are building a home in Attock, Jehlum, Islamabad, or Rawalpindi, you require a connection for your property. The Islamabad Electric Supply Company manages all the power supply in your region. So, the first and foremost step is to apply for a new connection to light up your property as soon as possible. IESCO made this process easier and more convenient through its online new connection process.
So, how to apply for an IESCO new connection is the main concern of customers? You just need to fill out their online application form for a new connection and follow their instructions. After submitting the form, their team will manage the whole process. Soon, they will set up your new connection after various steps. If you’re ready to apply for your new connection, then follow the guidelines given below in the article.

IESCO New Connection Requirements (Documents List)
Some important documents are required for the new connection application. Upload these documents in a file of 300 KB. Documents are listed below for the ease of our customers, so they can easily apply without the help of professionals.
- Property document copy
- Attested CNIC copy of the applicant
- Attested CNIC copy of witnesses
- Neighbours’ electricity bill copy
- Wiring contractorβs test report( mandatory)
How to apply the IESCO new meter
Applying for a new IESCO connection seems hectic, but it’s a simpler task than it used to be; now the web portal of ENC makes it quick for customers who want new connections. Let’s follow the steps given below and submit your ENC application.
- Visit the ENC website.
- Hit the Apply button.
- Fill out the subdivision information for your area or usage, such as the connection type (domestic or commercial).
- Fill out all the details related to personal information and premises details.
- Attach the required documents, but the file size must be 300 KB; it will not upload and create problems for you.
- Submit the application and take a printout. Important point to note that the ENC requires both online and offline applications for further installation procedures. So, first apply online, and then take the printout of that application and attach it to the documents to submit to their office.
- Attach the copies of all the required documents with the application and submit it to the IESCO office.
- Once your application is approved, IESCO will issue a demand notice, visit the ENC and download the demand notice, and then pay it.
Verification and Inspection
Iesco will verify the application after it is submitted to them. The process involves determining whether the new connection is feasible for your premises. Representatives from IESCO visit your place to assess safety standards, load capacity, and wiring.
IESCO Meter Charges 2026
Lum sum charges for new general connections under tariff A1 and A2 vary on the basis of the length of the service line and the type of meter a customer chooses. For more details and to understand the charges, check the meter charges below, and also visit the official website of ENC.
Single-phase meter charges
A single-phase is an electrical device used to measure the consumption of residential and small commercial sectors with a single phase(two-wire and neutral), mainly used for AC power supply. Single-phase meter charges based on the length of the service line are discussed below:
| Sr No | Details | Cost |
| 1 | Length of service line up to 20 meters | Rs. 8500/- |
| 2 | Length of service line above 20 and up to 30 meters | Rs. 10,500/- |
| 3 | Length of service line above 30 and up to 40 meters. | Rs. 11,500/- |
| 4 | Length of service line above 30 and up to 40 meters | Rs. 11,000+800 per meter above 40 meters |
| 5 | Length of service line above 40 and up to and including 100 meters with one span LT with Ant conductor and pole( excluding connections under housing societies) | Rs. 60,000+1000 per meter above 100 meters |
Three-phase meter charges
A three-phase meter is an electrical device used to measure the electrical consumption with three phases (L1, L2, L3) and its charges based on the length, which are discussed below in detail:
| Sr No | Details | Cost |
| 1 | Service line up to 20 meters | Rs. 36,500/- |
| 2 | Service line up to 30 meters | Rs. 43,000/- |
| 3 | Service line up to 40 meters | Rs. 50,000/- |
| 4 | For consumers having service lines above 40 meters, the actual cost of LT Pole, or allied material, is to be recovered from the consumers as per the latest / store rates/price bulletin issued by Chief Engineer (MM) IESCO. | Actual Cost |
How to track your IESCO application online
After the submission of the application, you will receive a tracking number, customer ID, and reference number from the official IESCO website. Curious to know what the status of your application is, so use one of the tracking numbers, customer ID, or reference number that seems most feasible to track through the IESCO new connection tracking portal. Here are some points for tracking your application:
- Visit the official tracking page of ENC
- Select New connection
- Enter your company, CNIC details, or Tracking ID
- Track your application after submitting the above details.
Time required for a new connection
Time shall be counted from the day you submit your registration, and your meter will be installed within the given time limit by IESCO. Based on Consumer Eligibility Criteria, IESCO shall provide electric power to the 95% of eligible customers. Time limit for new connections with different types is listed in the table:
| Sr No | Description | Time |
| 1 | For supply at a voltage level up to 400V and a load up to 15KW | 30 |
| 2 | For supply at a voltage level up to 400V and a load above 15KW but not exceeding 70KW | 53 |
| 3 | For supply at a voltage level up to 400V and a load up to 70KW, but not exceeding 500KW | 73 |
| 4 | For supply at a voltage level up to 400V and load up to 500KW, but not exceeding 5000KW | 106 |
| 5 | For supply at voltage level 66KV and above for all loads | 496 |
Meter installation and testing
Meter installation and testing will be done after the payment of the demand fee. IESCO will schedule meter installation and inform you about their installation. Their experts will install the meter, and after this, for the smooth electricity voltage, performance, and current, they test the installation process. Once the checking is done, IESCO will finally activate your connection.
Common issues and how to avoid them
Some applications of customers are rejected as they are not professionals, engineers, or technicians, and they select the wrong information. If you are also confused about the application, as you donβt know the process by which your application will be rejected. Let’s check the points and follow them during your application to avoid these mistakes:
- Incomplete documentation
- Selected the wrong connection type
- Invalid Property or Ownership
- Wrong wiring
The above issues are very common among customers; never make these mistakes during your application. Avoid the above issues by cross-checking your documents, select corect connection type, putting valid property details, and correcting wiring.
Energy conversion tips
Reduce your electricity bill after the installation of a new connection. Reduction in electricity usage will also help IESCO to manage its electricity distribution across the region.
- Unplug and switch off appliances when not in use.
- Use daylight and switch lights during the day
- Use smart and inverter appliances
Frequently Asked Questions
What is the total cost required for a new connection?
The cost of a new connection depends on the length of the service line and the type of meter. Single-phase meters differ in prices of three phase meter. Check the table above for prices.
How long does it take to get a new connection from IESCO?
The IESCO new connection takes a few weeks for its installation, as it is based on various factors, such as submission of application, verification, fee payment, and then the installation of the meter.
What documents are required for the application?
You will require an attested copy of CNIC, an attested copy of witnesses, proof of ownership, and test wiring.
Can I apply for an IESCO new connection online?
Yes, you can apply for a new connection online. Visit the official website of ENC and fill out the required information.